Phase 1Planning

5 %
  • Improve Income
  • Design Layout
  • Print Plans
  • Locate Build Site

Phase 2Getting Started

0 %
  • Purchase Trailer
  • Install Moisture Barrier
  • Build Subfloor
  • Insulate Subfloor
  • Build Framing
  • Install Sheathing
  • Build Loft

Phase 3Outside Finished, Inside Started

0 %
  • Install Siding
  • Install Skylight
  • Install Roofing
  • Install Electrical
  • Install Base Plumbing
  • Install Network Wires
  • Install AV Wires

Phase 4Complete the Shell

0 %
  • Insulate Walls & Ceiling
  • Install Cabinets
  • Cover Walls & Ceiling
  • Build Stairs

Phase 5Add Amenities

0 %
  • Build out Closets & Storage
  • Install Stove
  • Install Sinks
  • Install Shower
  • Install Toilet
  • Install Refrigerator

Phase 6Finishing Touches

0 %
  • Install Trim
  • Paint